Guest
You need to login to ask any Questions from chapter Chain-Surveying of Engineering-Survey-Mcqs
Chapter:
1. Correction per chain length of 100 links aong a slope of `alpha` radians is
2. Correction per chain length of 100 links along a slope having a rise of 1 unit in n horizontal units, is
3. Which instrument registers total distance covered by any number of pace?
4. Greater accuracy in linear measurement is obtained by
5. If h is difference in height between end points of a chain of length l, required slope correction is
6. Finding elevations of a point with respect to a given or assumed and establish points given elevation or at different elevations with respect to given or assumed datum is ________
7. Determining quantities or afford sufficient data for designing of works such as roads and reservoirs is called _______
8. Design a vernier for a odolite circle divided into degrees and one fourth degrees to read to `20^(' ') `
9. Â A survey which deals with bodies of water for purpose of navigation, water supply, harbor works or for determination of mean sea level is ________
10. What is used in centering aid in odolites, compass, plane table and variety of or surveying instruments?
All Chapters
Introduction to Survey objective
Chain Surveying
Compass Traversing
Topics
Introduction to Survey mcqs
Correction per chain length of 100 links aong a slope of `alpha` radians is
Correction per chain length of 100 links along a slope having a rise of 1 unit in n horizontal units, is
Which instrument registers total distance covered by any number of pace?
Greater accuracy in linear measurement is obtained by
If h is difference in height between end points of a chain of length l, required slope correction is
Finding elevations of a point with respect to a given or assumed and establish points given elevation or at different elevations with respect to given or assumed datum is ________
Determining quantities or afford sufficient data for designing of works such as roads and reservoirs is called _______
Design a vernier for a odolite circle divided into degrees and one fourth degrees to read to `20^(' ') `
 A survey which deals with bodies of water for purpose of navigation, water supply, harbor works or for determination of mean sea level is ________
What is used in centering aid in odolites, compass, plane table and variety of or surveying instruments?