Chapter:

Determining-Process-and-Measurement-System-Capability

1. When we want to troubleshoot out-of-control process, we use _____ control charts.


2. If average number of nonconformities per unit per sample is 0.074, what will be lower control limit for u-chart?


3. Which of se is a disadvantage of probability plot?


4. If xi=total number of nonconformities in a sample of ni inspection units, and re are N samples of different sample size, and x varies according to a Poisson distribution, what will be value of center line of u-chart?


5. When destructive testing is required, which type of control should be used?


6. What is center line value for average number of events control chart, when re is no standard given?


7. The efficiency of variable control charts is _____ efficiency of p-charts when p is small and far away from 0.5.


8. The OC curve of c-chart is a curve which plots β-risk against ___


9. When we don’t have mean, spread and shape of probability distribution of one CTQ characteristic of a process, we can use _______ for process capability analysis.


10. Which is more efficient in case of small samples to find out shape and spread of distribution?