Chapter:

Levelling

1. A signal must contain phase.


2. The formula for correction for temperature is _______


3. Covering whole survey area with primary triangulation but filling gaps with secondary and tertiary triangulation involves in which among following processes?


4. Which of following can describe main purpose of satellite station?


5. In which of following areas, usage of primary triangulation is done?


6. The length of tenth base is__________


7. Which type of structure (tower) can be used for small heights?


8. Reconnaissance process will give best output only on elevated grounds.


9. What will be correction for absolute length of length of line is 20m, correction is 2m and length of tape is 30m?


10. Length of base line in primary triangulation is given as____________