Chapter:

Modern-Quality-Management-and-Improvement

1. The chance and assignable cause terminology was developed by ___


2. Shifting of mean from current value to a new value and remaining re, is called _____ shift of mean.


3. The general model for lower control limit for a value of quality characteristic “w” will be _____


4. Which of se is a useful plot for identifying a potential relationship between two variables of a process?


5. The probability of a point to exceed control limits for a control chart is 0.0040. What will be ARL for this case?


6. Pareto chart identifies ________ defects not ________ defects.


7. Decreasing sample size will ____


8. For a process, sample size=5, process standard deviation=0.15, mean=1.5, and std. deviation of mean is 0.0671. What will be value of 3σ upper control limit for construction of control chart?


9. Type I error is described as situation of conclusion of process state as out-of-control when it is in-control.


10. The control charts formed for judgment of conformities and non-conformities are called __ control charts.