Theory
A project engineer receives a laboratory report with tests performed on the central material testing laboratory,IOE,Pulc…
`gamma=1.557(gm)/(cm^3)`
From Phase Diagram Of Soil · Soil Mechanics
A project engineer receives a laboratory report with tests performed on the central material testing laboratory,IOE,Pulc…
Prove: `gamma_(sb)=(G-1)/(1+e)*gamma_w`.where,`gamma_(sb)` represents submerged unit weight.
An embankment of `1,00,000 m^3` volume has to be constructed by compacting the soil brought from excavation site. After …
Define phase diagram. Draw the phase diagram for saturated, partially saturated and dry soil.
Explain the phase diagram of soil.
Prove: `gamma_d=gamma_t/(1+w)`
Prove `S_r *e=w*G`.
Sandy soil in the borrow pit has unit weights of solids as `25.8 (KN)/M^3`, water content equal to `11%` and bulk unit w…