Mention the engineering geological study with reference to the different phases for evaluation of EGS.
Write the main tasks for EGS in detailed design phase of civil engineering projects. [2072 Ashwin] [3]
Engineering geological studies have to be performed in different phases of any civil engineering projects.For avoiding unnecessary and excessive investment of time and moneyin order to get the required geotechnical information,Engineering geological studies are done systematically in the following phases:
The respective engineering Geological tasks in detail design phase are :
- Detail engineering geological mapping of selected sites.
- Rock studies nad mapping of selected sites for stability analysis and design of the support system.
- detail surface and subsurface exploration.
- In-site as well as laboratory tests.
All Chapters — Engineering Geology II
Similar Questions
From Introduction to Engineering Geology · Engineering Geology II
Theory
Theory
Describe the engineering significance of rock forming minerals.
MCQ
the physical properties of Aggregates are:
Theory
Describe the engineering significance of rock forming minerals.
Theory
Write down the parameters of engineering geological system.
Theory
What are the main parameters of engineering geological system?
Theory
What do you mean by Geological Maps? Explain the types of Geological maps.
Theory
Describe about the preparation of engineering geological map in the field.