MCQ
If the length of a chain line along a slope of `theta` is `l`, the required slope correction is
Which among the following methods is used for determining the precise position on the earth surface?
From Introduction to Survey objective · Engineering Survey Mcqs
If the length of a chain line along a slope of `theta` is `l`, the required slope correction is
Pacing is difficult in _______
Greater accuracy in linear measurement is obtained by
Accidental or compensating errors of length L are proportional to
Which among the following is one of the principles of surveying?
What is used in centering aid in theodolites, compass, plane table and variety of other surveying instruments?
Systematic error are those errors
A survey which deals with bodies of water for the purpose of navigation, water supply, harbor works or for the det…