Which of the following is made in connection with the construction of streets, water supply systems, sewers?
Correct distance obtained by an erroneous chain is
All Chapters — Engineering Survey Mcqs
Similar Questions
From Introduction to Survey objective · Engineering Survey Mcqs
MCQ
MCQ
Which instrument mechanism is operated by motion of the body and it automatically registers the number of paces, thus av…
MCQ
Which of the following is not a method of measuring the distances directly?
MCQ
Which of the following is not among the methods of linear measurements?
MCQ
A survey which deals with bodies of water for the purpose of navigation, water supply, harbor works or for the det…
MCQ
In which method measurements of distances are chiefly confined to the preliminary surveys and explorations where a surve…
MCQ
The formula for shrunk scale can be given as___________
MCQ
For exploring mineral wealth which type of surveying is used?