MCQ
In engineering drawing, which type of line indicates that there is a change of plane?
This content is available for premium members only. Please select a plan.
Login / Get AccessFrom Lines, Lettering and Dimensioning · Engineering Drawing MCQS
In engineering drawing, which type of line indicates that there is a change of plane?
Initial work and construction lines are drawn using __ pencil.
Extension lines should start from which part of the drawing?
Which is the wrong statement regarding dimensions?
The wrong statement about leader line is _________
How is tapped hole of diameter 10mm with 20mm dimensioned?
Length-to-height ratio of a closed filled arrow head is:</p>
Drawing pencils are graded according to increase in relative ______