MCQ
The class division for 3 tonne vehicle is named as ____ by Border Roads Organisation.
This content is available for premium members only. Please select a plan.
Login / Get AccessFrom Hill Roads · Highway Engineering
The class division for 3 tonne vehicle is named as ____ by Border Roads Organisation.
The total resisting length increases due to ______
The thickness of the pitching done by stone masonry to avoid erosion due to water is?
Catch water drains, sloping drain, road side drains, catch pit and culverts are periodically cleared to prevent ______
What is the minimum design speed on the major district road of hill?
The ruling gradient in steep terrain upto 3 km height in % is ______
Degree of stability of hill side slope don’t depend on ______
The preventive measure adopted in hill road don’t include ______