Covering whole survey area with primary triangulation but filling the gaps with secondary and tertiary triangulation inv…
Premium Content
This content is available for premium members only. Please select a plan.
Login / Get AccessSimilar Questions
From Triangulation · Surveying
MCQ
MCQ
A structure erected over a station can be determined as___________
MCQ
If the weight of the tape is 1kg having length 100m with 6 equal bays. The pull applied will be 9N, calculate the correc…
MCQ
The formula for correction for temperature is _______
MCQ
Which of the following method can be adopted if there is any object in the point of instrument station?
MCQ
What will be the correction for slope, if the length of the line is given as 20m with slope of 5˚46ꞌ?
MCQ
Height of the instrument depends upon ______
MCQ
Find the distance between the visible horizon, if the height of the station is given as 2.98m.