Scaling away patches of plaster of the previous coat is called as _____
Premium Content
This content is available for premium members only. Please select a plan.
Login / Get AccessSimilar Questions
From Pointing and Plastering · Construction & Building Materials
MCQ
MCQ
Wooden strips fixed to the surface on which first coat of plaster is applied are called as _____
MCQ
The mortar used for the smooth cast finish has cement and sand in the ratio of _______
MCQ
The wooden float is known as the __________ and it is used for final or finishing coat of plaster.
MCQ
The term ___________ plaster is used to indicate plaster of Paris with retarder.
MCQ
_______________ tool is used to check the level of plastered surface between the successive screeds.
MCQ
Undercoat is the first coat of plaster applied.
MCQ
Wooden float is also known as ________