While fixing rate per unit of an item, the quantity of materials and labour needed for one unit of an item are strictly …
Premium Content
This content is available for premium members only. Please select a plan.
Login / Get AccessSimilar Questions
From Rate Analysis, Estimation and Costing · Construction & Building Materials
Which of the following is the correct order of stages of estimation of concrete roads?
In the case of works which require some special types of equipment, an amount of __ percent of the estimated cost is giv…
Single units work such as doors and windows are expressed in ____
Which of the following is not a method used for preparing approximate estimates?
Which of the following data is not required to prepare an estimate?
To get the quantities, the lengths found using the long wall-short wall method are multiplied with _____
As per IS 3861-1966, which of the following areas should not be included while calculating the plinth area of a building…