Chapter:

Design-of-Highway-Pavements

The thickness of a PCC pavement is 20 cm and width of lane is 3.5 m. Find area of a tie bar system along longitudinal joints if unit weight of concrete is 2400 kg/3, coefficient of friction is 1.2 and allowable tensile stress in deformed bars is 2000 kg/cm2.