Chapter:

Jigs-and-Fixture,-Applications-and-Gears

In an NC machining operation, tool has to be moved from point (5, 4) to point (7, 2) along a circular path with centre at (5, 2). Before starting operation, tool is at (5, 4). The correct G and N codes for this motion are


All Chapters

View all Chapter and number of question available From each chapter from Manufacturing-engineering-I