Which ethnic caste of Nepal celebrate their marriage only in Mangshir month?
Premium Content
This content is available for premium members only. Please select a plan.
Login / Get AccessSimilar Questions
From Civil engineer 7th level loksewa exam important questions · Civil engineer 7th level loksewa exam
MCQ
MCQ
Carpet area does not include the area of
MCQ
For concreting tunnel linings transportation of concrete is done by
MCQ
Sand required a high water cement ratio belongs to
MCQ
Which of the following construction materials is not a constituent of cement concrete?
MCQ
The compacting factor test of cement concrete determines its
MCQ
Select a suitable figure from the Answer Figures that would replace the question mark (?).
MCQ
A can do a job in 40 days, A and B both can do the same job in 8 days. How many days will B take to do the alone?