'A' ले १८ दिनमा र 'B' ले १५ दिनमा काम सक्न सक्छन् । B ले १० दिन काम गरे र काम छोडे। कति दिनमा A एक्लैले बाँकी काम पूरा ग…
Premium Content
This content is available for premium members only. Please select a plan.
Login / Get AccessSimilar Questions
From Sub Engineer exam question 2 · Sub Engineer exam questions
MCQ
MCQ
Which one of the following does not fall under the category hoisting equipment ?
MCQ
According to I.C.A.O. the recommended length of air ports is decided on
MCQ
The total pressure force on a plane area is equal to the area multiplied by the intensity of pressure at its centroid, i…
MCQ
An independent mass of a fluid does not posses
MCQ
In PERT technique, completion of an activity is called
MCQ
The minimum water content at which the soil just begins to crumble when rolled into threads 3 mm in diameter, is known&n…
MCQ
Find the number of triangles in the given figure.