Due to change in price level, a revised estimate is prepared if the sanctioned estimate exceeds
From Estimating And Costing Mcqs · Estimating And Costing Mcqs
Due to change in price level, a revised estimate is prepared if the sanctioned estimate exceeds
For the construction of buildings, the subheads of the estimate are
The computation of stress in plastic equilibrium is based on .....................
The brick work is not measured in cu m in case of .....................
The size of the bulldozer is indicated by the dimension of its ...................
The heavy particles in the tank ...........
A ...................is a type of toilet that collects human faeces in a hole in the ground.
A structure that carries water above land is known as an ...........................