A .........................is used to level the ground and spreads the loose material.
From Estimating And Costing Mcqs · Estimating And Costing Mcqs
A .........................is used to level the ground and spreads the loose material.
Brick walls are measured in sq. m if the thickness of the wall is
The expected out turn of 2.5 cm cement concrete floor per manson per day
...............................consists of a large bucket which is attached to a tractor.
The brick work is not measured in cu m in case of
The minimum width of a septic tank is taken
In long and short wall method of estimation, the length of long wall is the centre to centre distance between the walls …
The unit of payment of cement concrete in lintels is ...................