Pick up the correct statement from the following:
From Estimating And Costing Mcqs · Estimating And Costing Mcqs
Pick up the correct statement from the following:
The wedge-shaped portion of the backfill tending to move with the wall is called
In which type of estimate is 'Court yard' NOT considered?</p>
The expected out turn of cement concrete 1 : 2 : 4 per mason per day is
Pick up the correct statement in case of water supply.
The item of steel work which is measured in sq.m, is
For third class building flooring shall be of brick-on-edge floor over well rammed earth.
The coefficient of earth pressure when the soil is at equilibrium is .......................