In an assembly section, these parts should have their section lines left out or shown solid black:
Premium Content
This content is available for premium members only. Please select a plan.
Login / Get AccessSimilar Questions
From Engineering Drawing Important MCQS · Engineering Drawing MCQS
MCQ
MCQ
In order to create an accurate assembly drawing the drafter should create the ________ drawings first.
MCQ
The size of the A0 size drawing sheet is ______</p>
MCQ
These are lines drawn on a map to locate, in the plan view, points of equal ground elevation:
MCQ
The title block used on working drawings should include the _________.
MCQ
The daily workload of a ________ drafter would generally include technical drawings of machine parts.
MCQ
A typical set of mechanical working drawings includes ________.
MCQ
These items typically are not used in new designs, but are still common in high-power amplifiers: