Pick up the correct statement from the following:
From Estimating And Costing Mcqs · Estimating And Costing Mcqs
Pick up the correct statement from the following:
The item of steel work which is measured in sq.m, is
If the span of crossing is greater than 12 feet (3.7 m), the structure is termed as bridge and otherwise is culvert.
The minimum width of a septic tank is taken
The expected out turn of 12 mm plastering with cement mortar is
The item of the brick structure measured in sq.m, is
The material retained or supported by the retaining structure is called .....................
The area of a sloping surface of a protective embankment of mean height ‘d’, side slopes S : 1 and length &l…