MCQ
Pick up the incorrect statement from the following:
From Estimating And Costing Mcqs · Estimating And Costing Mcqs
Pick up the incorrect statement from the following:
The unit of measurement is per quintal for the following:
If the span of crossing is greater than 12 feet (3.7 m), the structure is termed as bridge and otherwise is culvert.
Culverts cannot be constructed of a variety of materials including cast-in-place or precast concrete.
The expected out turn of 12 mm plastering with cement mortar is:</p>
Due to change in price level, a revised estimate is prepared if the sanctioned estimate exceeds
The slope of the outlet of 'P trap' below the horizontal is kept
The expected out turn of 2.5 cm cement concrete floor per manson per day