MCQ
What is the minimum period for which the lime concrete in foundation be left wet without the construction of masonry ove…
From Estimating And Costing Loksewa Mcqs · Estimating And Costing Mcqs
What is the minimum period for which the lime concrete in foundation be left wet without the construction of masonry ove…
Actual cost of construction plus certain profit is paid to the contractor, Such a contract is known as
The approximate cost of the complete labour as a percentage of the total cost of the building is
The amount required to be deposited by a contractor while submitting a tender is known as
Which of the following is the most correct estimate?
The standard width of asbestos cement corrugated sheet is
The technique of finding the fair price of an existing building or property is known as
The value of the dismantled material less the cost of dismantling is called