MCQ
The time which result in the least possible construction cost of an activity, is known
This content is available for premium members only. Please select a plan.
Login / Get AccessFrom Contruction Management mcqs 2 · Contruction Management mcqs
The time which result in the least possible construction cost of an activity, is known
Negative float for any activity means that the activity is:
A document containing detailed description of all the items of work (but their quantities are not mentioned) together wi…
The most popular type of organization used for civil engineering construction is:
The main purpose of planned maintenance of roads is:
Interfering float is the difference between
Negative slack indicates
If for an activity optimistic time is 1 day pessimistic times is 8 days and most likely time is 3 days then the expected…