The estimated time required to perform an activity, is known as
This content is available for premium members only. Please select a plan.
Login / Get AccessFrom Contruction Management mcqs 2 · Contruction Management mcqs
The estimated time required to perform an activity, is known as
Positive float for any activity means that the activity is
In the construction industry arbitration method is used for:
The amount required to be deposited by a contractor while submitting a tender is known as
Quality assurance plan is prepared :
The difference between the time available to do a job and the time required to do the job, is known as
A quality assurance plan is prepared by
Earliest finish of an activity is always