If for an activity optimistic time is $1$ day, pessimistic time is $11$ days and most likely time is $3$ days then the e…
This content is available for premium members only. Please select a plan.
Login / Get AccessFrom Contruction Management mcqs 3 · Contruction Management mcqs
If for an activity optimistic time is $1$ day, pessimistic time is $11$ days and most likely time is $3$ days then the e…
Quality assurance presents
Find the variance if $t_p = 14$ days, $t_m = 6$ days and $t_o = 2$ days.
Monitoring helps for evaluation while evaluation helps for
The document giving the information about the tender, prequalification, contractor, construction, procurement of materia…
The maximum number of tail event occurring in a CPM is
Whenever activity has zero total float, then
When the times of earliest finish and the latest finish are equal in an operation, the operation is called