MCQ
When all the paths are arranged according to the descending order of the float, the path which is next to the critical p…
This content is available for premium members only. Please select a plan.
Login / Get AccessFrom Contruction Management mcqs 3 · Contruction Management mcqs
When all the paths are arranged according to the descending order of the float, the path which is next to the critical p…
The time below witch the duration can not be further reduced is known as
For the execution of work in time, work plan is prepared by
The purpose of bid evaluation is to determine:
For a $\beta$-distribution curve, if $t_o$ is the optimistic time and $t_p$ the pessimistic time then the standard devia…
PERT technique of network analysis is useful for
The earned value technique in construction management is also known as
A dummy activity