MCQ
The shuttering of a hall measuring 4m × 5m, can be removed after
This content is available for premium members only. Please select a plan.
Login / Get AccessFrom Concrete Technology Mcqs 2 · Concrete Technology Mcqs
The shuttering of a hall measuring 4m × 5m, can be removed after
Too wet concrete may cause
In the manufacture of cement, the dry or wet mixture of calcareous and argillaceous materials is burnt at a temperature …
The aggregate is said to be flaky when
Workability of concrete mix with low water cement ratio is determined by
The ratio of various ingredients (cement, sand, aggregates) in concrete of grade M 200, is
For soundness test of cement we use
After 28 days concrete acquires