Nepal has prioritized Run-of-River hydropower projects for electricity generation. With the help of a neat schematic dia…
If the mean monthly flow of a typical Nepalese River from Jan to Dec is 14.3, 13.2, 16.4, 23.5, 39.0, 73.0, 168.2, 195.6, 145.1, 74.5, 42.8, and 23.7 m³/s.
The headwater level is 1,000 m, whereas Tailwater level is 800 m and can be considered as constant. Assuming design discharge as 70 m³/s, headloss as 3%, overall efficiency as 90%;
a) Compute the % exceedance of design flow? (3)
b) Compute firm and secondary energy produced by the plant?(5)
c) What is the % of dry season (Dec-Mar) and wet season energy of this plant? (2)
[2081-12-13 Karnali ] [10]All Chapters — Civil engineering 7th level second paper question bank
Similar Questions
From Hydropower · Civil engineering 7th level second paper question bank
List out the major activities to be carried out for a feasibility study of a hydropower project. Summarise the purposes …
What are the major problems in operation and management of irrigation systems of Nepal? Describe the pros and cons of pe…
Explain the suitability, advantages and limitations of run-off river and peaking ROR storage hydropower projects with ex…
Explain about Dam classification and their usage based on functionality and construction materials.
In hydropower structures, what is the purpose of de-sanding basin? Explain its types and factors to be considered in its…
In hydropower sector, what is the power demand analysis and how is it carried out?
How does a siphon spillway function? How can the siphon spillway be primed? What are the limitations of a siphon spillwa…