Estimating And Costing Mcqs

Course: Estimating And Costing Mcqs — Practice MCQs, solutions, formulas & past entrance questions.

Chapter:

estimating-and-costing-mcqs (Click to view content)

1. Calculate number of bags of cement required for 12 mm thick plastering of a wall of 5 m long, 3.5 m high and 300 mm thick, if 1: 3 cement mortar is used.


2. A cement concrete road is 1000 m long, 8 m wide and 15 cm thick over sub-base of 10 cm thick gravel. The box cutting in road crust is


3. The carpet area of a residential building is generally ____________ of its plinth area.


4. Pick up excavation where measurements are made in square meters for payment.


5. For 12 mm thick cement plastering 1 : 6 on 100 sq.m new brick work, quantity of cement required, is


6. For construction of buildings, subheads of estimate are


7. Due to change in price level, a revised estimate is prepared if sanctioned estimate exceeds


8. Which of following states that work expands to fill time available.


9.
The main factor to be considered while preparing a detailed estimate, is


10. The order of booking dimensions is