1. A relatively fixed point of known elevation above datum, is called
2. For indirect ranging, number of ranging rods required, is
3. In chain-surveying field work is limited to
4. The main principle of surveying is to work
5. The line of collimation method of reduction of levels, does not provide a check on
6. If h is difference in height between end points of a chain of length l, required slope correction is
7. Levelling across a river is done by
8. Systematic errors are those errors
9. The object of surveying is to be prepare
10. Planimeter is used for measuring