Chapter:

Engineering-Surveying-Mcqs-1

1. A relatively fixed point of known elevation above datum, is called


2. For indirect ranging, number of ranging rods required, is


3. In chain-surveying field work is limited to


4. The main principle of surveying is to work


5. The line of collimation method of reduction of levels, does not provide a check on


6. If h is difference in height between end points of a chain of length l, required slope correction is


7. Levelling across a river is done by


8. Systematic errors are those errors


9. The object of surveying is to be prepare


10. Planimeter is used for measuring