1. Calculate number of bags of cement required for 12 mm thick plastering of a wall of 5 m long, 3.5 m high and 300 mm thick, if 1: 3 cement mortar is used.


2.
A portion of an embankment having a uniform up-gradient 1 in 500 is circular with radius 1000 m of centre line. It subtends 180 at centre. If height of bank is 1 m at lower end, and side slopes 2:1, earth work involved.


3. Pick up correct statement from following:


4. For fourth class building doors and windows shall be of ...................wood or country wood.


5. The area of a sloping surface of a protective embankment of mean height ‘d’, side slopes S : 1 and length ‘L’ is


6. Size, capacity and materials need be specified for


7. The measurement is made for stone work in square metre in case of


8. What is quantity of cement (in kg) and of dry sand (in cubic meter) respectively required for preparing 1 cubic meter of wet cement mortar of 1 : 5 proportion?


9. Berms are provided in canals if se are


10.
In mid-section formula