Chapter:

Geometric-Design-of-Highways

1. The filler material should pass from ______


2. The temperature in Marshall’s method is ______


3. The softening point of bitumen in given options (in degree Celsius) will be ______


4. The waste material mostly used in pavement is ______


5. Tar is obtained from ______


6. The volume of water in soundness test is?


7. Which type of aggregates gives good workability?


8. The slope of curve obtained between number of blows and water content in cassagrande’s method is ______


9. The skid number for highways should not be less than ______


10. If permeability is high n its void ratio is ______