Highway Economics and Finance
Course: Highway Engineering — Practice MCQs, solutions, formulas & past entrance questions.
Chapter:
Highway-Economics-and-Finance (Click to view content)
|
1. If principal is P and rate of interest is i and it has to be paid in n years n, sum S is given by ______ |
|
2. The ratio of annual benefit from improvement to annual cost of improvement is called ______ |
|
3. The average annual highway cost for a road system may be summed up by ______ |
|
4. The cost of vehicle operation and time for unit distance may be represented by ______ |
|
5. As on April 2009, how many projects have been completed on BOT basis? |
|
6. The method not used in economic analysis is ______ |
|
7. The improvement in highway leads to following. |
|
8. As unevenness index increases re is no substantial increase in ______ |
|
9. The benefits due to road improvement are classified into how many types? |
|
10. The unevenness index in terms of international roughness index is given by ______ |
All Chapters
View all Chapter and number of question available From each chapter from Highway-Engineering
Highway Engineering Basics
Highway Engineering Basics
Highway Development and Planning
Highway Development and Planning
Highway Alignment and Project Preparation
Highway Alignment and Project Preparation
Geometric Design of Highways
Geometric Design of Highways
Traffic Engineering
Traffic Engineering
Properties of Highway Materials
Properties of Highway Materials
Design of Highway Pavements
Design of Highway Pavements
Highway Construction
Highway Construction
Soil Stabilized Roads
Soil Stabilized Roads
Highway Maintenence
Highway Maintenence
Highway Drainage
Highway Drainage
Hill Roads
Hill Roads
Road Side Development
Road Side Development
Highway Economics and Finance
Highway Economics and Finance
Topics
This Chapter Highway-Economics-and-Finance consists of the following topics
Guest