Well Foundations

Course: Foundation Engineering Mcqs — Practice MCQs, solutions, formulas & past entrance questions.

Chapter:

well-foundations (Click to view content)

1. Laying of well curb in river bed having water, is done by _____


2. According to Terzaghi and Peck, ultimate bearing capacity can be determined by which of following expression?


3. Disadvantage of using pneumatic caissons are ____


4. The grip length of well is taken as _____ below scour level in roads.


5. Which of following caissons, permits excavation in dry?


6. The maximum depth of scour at nose of pier is ___ Lacey’s value.


7. To counter act tilts in well during sinking operations, which of following measures can be used?


8. Excavation of soil inside well in river beds can be done by ____


9. In which of following methods, hydraulic jack is used to counter attack tilt in well?


10. A sharp vertical edge for well is provided at _____


WhatsApp