Login to ask a question from Tacheometry Surveying

Explain the Field Procedure in Tacheometry Traversing.

  • Reconnaissance
  • Establishment of tacheometric closed traverse as per field requirement ensuring each instrument station should command a wide area. If the area is too large,link traverse and addition of triangles may also be prederred.


  • A tacheometer is set up at the starting station. It is centered and levelled accurately. Height of instruments is Measured.
  • The instrument is oriented with reference to any predetermined station (BS) by taking it's bearing.Horizontal angles of all nearby details are recorded in a field book. Index map and reference sketches are also prepared in field.
S.No.Instrument stationSighted toHCRVertical/Zenithal angle

Top stadia

hair reading

middle stadia

hair reading

Bottom stadia

hair reading

Remarks


Show More
Previous Question Next Question
🔗

Similar Questions

From Tacheometry Surveying · Surveying II

View All
WhatsApp