MCQ
To continue a survey line AB past an obstacle, a line BC 100 m long was set out perpendicular to AB and from C a…
How many types of chains are used in chain surveying?
From Chain Surveying · Engineering Survey Mcqs
To continue a survey line AB past an obstacle, a line BC 100 m long was set out perpendicular to AB and from C a…
Prolongation of a chain line across an obstruction in chain surveying is done by
While measuring a chain line between two stations A and B intervened by a raised ground
The accuracy of measurement in chain surveying does not depend upon
For taking offsets with an optical square on the right hand side of the chain line, it is held by
A well conditioned triangle has no angle less than
Survey stations may be marked on the ground using a
The limiting length of an offset does not depend upon