The book in which chain measurements are entered is called:
To continue a survey line AB past an obstacle, a line BC 100 m long was
set out perpendicular to AB and from C angles BCD and BCE were set out
at 60° and 45° respectively. Determine the lengths which must be chained
off along CD in order that ED may be in AB produced?