Estimating is the technique of calculating the various quantities and is needed for controlling the expenditure during t…
Premium Content
This content is available for premium members only. Please select a plan.
Login / Get AccessSimilar Questions
From Rate Analysis, Estimation and Costing · Construction & Building Materials
The concrete used for cement concrete roads is of grade _______
Works like whitewashing and plastering are measured in ____
In long wall-short wall method, the length of the short wall generally increases from earthwork to brickwork in the supe…
In earthwork calculations, how many lifts are to be paid to the contractor when the earth is to be lifted for 4.5 metres…
As per IS 3861-1966, which of the following areas should not be included while calculating the plinth area of a building…
As per the rules for measurement of items, it is specified that the areas should be measured to the nearest ____
Which of the following is not a lumpsum item in the estimate?