Which of the following is not a lumpsum item in the estimate?
Premium Content
This content is available for premium members only. Please select a plan.
Login / Get AccessSimilar Questions
From Rate Analysis, Estimation and Costing · Construction & Building Materials
The quantity of sand required for RCC (1:2:4) for 15 cubic metres of work is _______
In the plinth area method, the cost of construction is computed by the multiplication of ____
Work consisting of linear measurements like fencing which involve lengths is measured in ______
The concrete used for cement concrete roads is of grade _______
In long wall-short wall method, the length of the long wall is calculated after the addition of _____ to its centre line…
Unit of measurement for damp proof course is ________
Estimating is the technique of calculating the various quantities and is needed for controlling the expenditure during t…