The concrete used for cement concrete roads is of grade _______
Premium Content
This content is available for premium members only. Please select a plan.
Login / Get AccessSimilar Questions
From Rate Analysis, Estimation and Costing · Construction & Building Materials
The quantity of sand required for RCC (1:2:4) for 15 cubic metres of work is _______
Which of the following data is not required to prepare an estimate?
Unit of measurement of rainwater pipe is ____
In the plinth area method, the cost of construction is computed by the multiplication of ____
To get the quantities, the lengths found using the long wall-short wall method are multiplied with _____
The quantity of coarse aggregate required for RCC (1:3:6) for 20 cubic metres of work is ____
In long wall-short wall method, the length of the long wall is calculated after the addition of _____ to its centre line…