Which of the following states that work expands to fill the time available.
Purposes of rate analysis are
a. To determine the current rate per unit of an item at the locality
b. To examine the viability of rates offered by contractors
c. To calculate the quantity of materials and labour strength required for project planning
d. To fix labour contract rates