The measurement is made for stone work in square metre in case of
Determine the approximate proportion of dry cement mortar required for brick work with bricks of nominal size 19 cm x 9 cm x 9 cm, with 18 % extra for frog filling and wastage is : (assume 1 m3 of wet mortar = 1.3 m3 of dry mortar):
All Chapters — Estimating And Costing Mcqs
Similar Questions
From Estimating And Costing Mcqs · Estimating And Costing Mcqs
.....................................type of excavator is used for digging at or below the operating level.
The plastic state of stress was proposed by
The expected out turn of 2.5 cm cement concrete floor per manson per day
Berms are provided in canals if these are
While estimating a reinforced cement structure, the omitted cover of concrete is assumed
The brick work is not measured in cu m in case of
On designing retaining walls it is necessary to take care of .....................exerted by soil mass.