MCQ
The water proof mud- plaster consists of
From Estimating And Costing Mcqs · Estimating And Costing Mcqs
The water proof mud- plaster consists of
The rate of payment is made for 100 cu m (per % cu m) in case of
The most reliable estimate is
Approximate cost of sewerage project for a population of one Rs. 10/- head works out as Rs. 10 lakh.
It is often difficult to estimate size at an early stage in a project when only a specification is available
The expected out turn of the cement concrete 1 : 2 : 4 for per mason per day will be:</p>
Pick up the incorrect statement from the following:
The size of the faeces drop hole in the floor or slab should not be larger than