The rate of payment is made for 100 cu m (per % cu m) in case of
From Estimating And Costing Mcqs · Estimating And Costing Mcqs
The rate of payment is made for 100 cu m (per % cu m) in case of
The main factor to be considered while preparing a detailed estimate, is
The item of steel work which is measured in sq.m, is
The cross-sections for a highway is taken at
If the span of crossing is greater than 12 feet (3.7 m), the structure is termed as bridge and otherwise is culvert.
The brick work is measured in sq metre, in case of
The order of booking dimensions is
The ground surface slopes 1 in 50 along a proposed railway embankment 150 m in length. The height of the embankment at z…