MCQ
As of 2013 pit latrines are used by an estimated .........................people.
From Estimating And Costing Mcqs · Estimating And Costing Mcqs
As of 2013 pit latrines are used by an estimated .........................people.
Pick up the correct statement from the following:
Approx. cost of a bridge of 3 spans of 50 m each span @Rs.30000/- per running m of span comes to 3*50*30000 = Rs. 45 lak…
If tensile stress of a steel rod of diameter D is 1400 kg/cm2 and bond stress is 6 kg/cm2, the required bond length of t…
The item of the brick structure measured in sq.m, is
While estimating the qualities for the construction of a building, the correct metric unit is
The rate of an item of work depends on
The floor area includes the area of the balcony up to