MCQ
Pick up the item whose weight is added to the weight of respective item, is
From Estimating And Costing Mcqs · Estimating And Costing Mcqs
Pick up the item whose weight is added to the weight of respective item, is
In which type of estimate is 'Court yard' NOT considered?</p>
Brick walls are measured in sq. m if the thickness of the wall is
In case of laying gullies, siphons, intercepting traps, the cost includes
Per kilometre basis depending on the nature of road, for 10 km of a state highway approx. cost @ Rs. 50000/- per 1 km wo…
.................................type of excavator carries the skimmer at its lower end.
The area is measured correct to the nearest
...................................is required for preliminary studies of various aspects of a work or project.