A person constructed a warehouse at a cost of Rs. 4,00,000, excluding the cost of land. The warehouse will become obsole…
The area is measured correct to the nearest
All Chapters — Estimating And Costing Mcqs
Similar Questions
From Estimating And Costing Mcqs · Estimating And Costing Mcqs
MCQ
MCQ
The material retained or supported by the retaining structure is called .....................
MCQ
As per Indian Standard Specifications, the peak discharge for domestic purposes per capita per minute, is taken
MCQ
The carpet area of a residential building is generally ____________ of its plinth area.</p>
MCQ
...................................type of excavator used for digging the foundation trenches below operating level.
MCQ
What is the mixture of methane and carbon-dioxide of anaerobic digestion called?
MCQ
Due to change in price level, a revised estimate is prepared if the sanctioned estimate exceeds
MCQ
Pick up the incorrect statement regarding a master trap from the following: