MCQ
Due to change in price level, a revised estimate is prepared if the sanctioned estimate exceeds
From Estimating And Costing Mcqs · Estimating And Costing Mcqs
Due to change in price level, a revised estimate is prepared if the sanctioned estimate exceeds
For 12 mm thick cement plastering 1 : 6 on 100 sq.m new brick work, the quantity of cement required, is
The roofing cannot be made with slate.
For fourth class building the doors and windows shall be of ...................wood or country wood.
An ...............................is an oldest type of machine which removes earth.
The water proof mud- plaster consists of
For First class building drawing room and dining room floors shall be of .....................
The 'centre line method' is specially adopted for estimating