MCQ
The quantity of sand required for RCC (1:2:4) for 15 cubic metres of work is
From Estimating And Costing Mcqs · Estimating And Costing Mcqs
The quantity of sand required for RCC (1:2:4) for 15 cubic metres of work is
The measurement is not made in square metres in case of
The plinth area of a building not includes
In case of laying gullies, siphons, intercepting traps, the cost includes
A cement concrete road is 1000 m long, 8 m wide and 15 cm thick over the sub-base of 10 cm thick gravel. The box cutting…
A large work or project may consists of several building or small works and each of these work is known as .............…
The expected out turn of cement concrete 1 : 2 : 4 per mason per day is
The expected out turn of 12 mm plastering with cement mortar is:</p>